Hubei Shenghui Special Automobile Co.,Ltd.
Shacman 8*4 concrete mixer truck
Description:
1. Chassis: Dongfeng, Sinotruk, FOTON/ Forland, Faw, Shacman, etc.
2.4X2 6X4, 8X4 drive.
3.Loading volume: 3, 4, 5, 6 , 7, 8, 9, 10, 11, 12, 15M3
4. High Tension Steel Q345 Tank Material in 5mm.
5. International Brand Motor, Pump, Reductor & Radiator
6. 400Liter Water Tank with Pressure Water Filling
7. Water Filling System to Keep the cement moisture.
8. Tank and hand Washing Device.
The mixing tank body is made of high strength wear-resistant steel plate, cage type mold are integrally formed to ensure that the flange, sections of the cylinder body and rolling the coaxial degree and circle beat, to ensure smooth operation of the vehicle. The tank body adopts the double helix blade, moderate density and taper before the gateball symmetric stirring plate and tank mouth at the installation of blades and a material guide vanes, resorted to materials to be more even faster.
Vehicle description |
Overall dimension |
10150*2525*3965mm |
GVW |
31000kg |
Curb weight |
14270kg |
Chassis brand |
SHACMAN |
Traction type |
8*4, left/right hand drive |
Chassis description |
Chassis model |
SX1319 |
Cab |
2 rear windows, mechanical sunroof, hydraulic suspension cab, hydraulic driver seat with seat-belts, 1 sleeping bed, hydraulic reversal, metal bumper |
Wheelbase |
1800+3000+1300mm |
Tire specification |
11.00R20 |
Tire quantity |
12+1 units |
Engine |
Engine model |
WP8.350E61 |
Emission level |
Euro 2 |
Displacement/output |
7800ml/257kw |
Horse power |
350hp |
Gear box |
Model |
12MT |
Number of gears |
10 forward gears& 2 reverse |
Brake system |
Type |
Drum |
Service brake |
Dual-circuit compressed air brake |
Park brake |
Power spring brake acting on rear wheel |
Auxiliary brake |
Exhaust brake |
Axle |
Front |
9T*2-MAN technology |
Rear |
18T*2-MAN technology, hub reduction |
Suspension |
Front |
Leaf spring |
Rear |
Leaf spring |
Fuel tanker |
Type |
Steel fuel tank, with lockable cap |
Capacity |
420L |
Up-parts description |
Drum |
Drum mixing volume |
12-14cbm |
Feed rate |
≥2.5 |
Output rate |
≥2 |
Residual ratio |
<1% |
Material |
Carbon steel or alloy steel |
Reducer |
Imported brand or Chinese top brand |
Hydraulic pump |
Imported brand or Chinese top brand |
Hydraulic motor |
Imported brand or Chinese top brand |
Radiator |
Chinese top brand |
Water supply system |
Water tank volume |
400L |
Water supply type |
Air pressure |
Products Catalog:
1. LPG Tank Truck Trailer/ Fuel Tanker Truck/ LPG station
2. Water truck / Water Tank Truck / Water Sprinkler Truck/Water Tanker
3. Truck with crane / Truck mounted crane
4. Dump Truck / Tipper Truck/Side Tipper/End Tipper
5. Fire Fighting Truck / Fire Truck / Fire Vehicle
6. Concrete Mixer Truck
7. Van truck / Blasting equipment transporter/ Refrigerated truck
8. Fecal suction truck / Sewage suction truck
9. Cement Powder Tank truck/ Bulk cement truck
10. High-altitude operation truck,
11. Self-loading garbage truck, garbage compactor truck, sealed garbage truck
12. Tractor
13. High Pressure Cleaning Truck
14. Sweeper Truck
15. Semi Trailer ( flat bed trailer / skeleton trailer / dump semi trailer / side wall trailer / low bed trailer / van container trailer / warehouse trailer, etc. )
FAQ
1. Q: How about the quality of trucks of your factory?
A: Our trucks get ISO 9001: 2008 and CCC, B&V and other related certificates. The chassis and spare parts come from the original manufacturers with anti-fake label.
2. Q: How many years of your company's service, especially after-sale service?
A:Hubei Shenghui is a long-term business partner of CLW group and our group has been in this field for nearly 15 years and has strong production and distribution capability, we can produce your products in 15 working days. We offer 1 year after-sale service.
3. Q: Is there any advantages of your price?
A: CLW Group is one of the most important suppliers of Sinotruk, Shacman, Dongfeng, FOTON and FAW, which provides guarantees for reasonable price and good quality.
4. Price term: FOB, CIF.
5. Payment: 30% deposit after order confirmation, 70% balance should be paid before delivery. All are by T/T, L/C.
6. Delivery time: 25 working days after payment is received.
7. Standard Steering: Left-hand drive, if you need Right-hand drives, please inform us, will make special order for you.